Transportation

Haben Blvd. Roundabout

The Haben Boulevard Gateway project consisted of the construction of the Haben Boulevard roundabout and related stormwater relief in the City of Palmetto. The project consisted of a two lane roundabout and a 36” storm sewer line from an existing drainage ditch to empty into the Manatee River. This project had a unique stormwater retention system, which incorporated a series of 18” and 6” perforated pipes as a replacement for a standard open air retention system. This challenging design allowed the City to reduce the budget costs of the project by negating the need to purchase additional land to accommodate a traditional retention pond.

Client: City of Palmetto
Location: Haben Blv.
Palmetto, FL